Utama e-jurnal

Analisis Tarif Jalan Tol Dengan Pendekatan Ability To Pay (ATP) Dan Willingness To Pay (WTP) (Studi Kasus Jalan Tol Jagorawi)

fakultas :
Teknik
pengarang :
Aziss Taufik Pataka Kayua Salazaar Dalimunthe dan Madi Hermadi
tanggal :
November 2020
seri :
Edisi Khusus, No 1, November 2020
issn :
1978-001X

Jagorawi Toll Road (Jakarta – Bogor – Ciawi), is the first toll in Indonesia. Toll Jagorawi, which has a total length of 59 km, connects Jakarta, Bogor and Ciawi. At present the Jagorawi toll road is integrated with various toll roads other. Among them are the Jakarta Inner Ring Road (JIRR), Jakarta Outer Ring Road (JORR), Bogor Outer Ring Road (BORR) and Bocimi (Bogor-Ciawi-Sukabumi). Jagorawi is a sample for other toll roads, because the construction is still good. Arrangement of green space is quite arranged so that it makes beautiful along the road.

kata kunci :
Jagorawi toll road, Ability To Pay (ATP), Willingness To Pay (WTP)

Bootstrap
alamat : Jln. Letjen T.B. Simatupang No.152 Tanjung Barat Jagakarsa - Jakarta Selatan 12530 telp : (021) 7890 634, 789 0965, 788 31838 fax: (021) 789 0966

© 2024 utama All Rights Reserved
http://167.86.71.230/, http://178.18.249.241/, http://144.91.78.201/, http://144.91.78.54/, http://158.220.111.56/, http://62.171.152.84/, http://144.91.113.160/, http://144.91.120.67/, http://164.68.102.56/, http://164.68.106.236/, http://167.86.81.239/, http://84.247.149.165/, http://38.242.243.12/,