Analisis Rekayasa Nilai (ve) Struktur Konvensional Menjadi Precast Pada Proyek Rusun Polri Kedaung Ciputat Tangerang Selatan

fakultas :
Teknik
pengarang :
Eko Gantika dan Eri Susanto Hariyadi
tanggal :
Oktober 2020
seri :
Edisi Khusus, No 4, Oktober 2020
issn :
1978-001X

One method of analysis to evaluate construction project planning with the aim of saving budget costs, optimizing performance and time efficiency and still paying attention to the quality of the work is to use Value Engineering. The main reason for this method of analysis is a systematic and directed evaluation approach to the object being reviewed. The stages in the Job Plan are the Information, Creative, Analysis and Recommendation Phases by determining which activities have the highest costs, then analyzed to determine alternative comparisons to the Life Cycle Cost with the classification of basic functions and secondary functions to obtain a Cost / Worth ratio.

kata kunci :
Value Engineering, Job Plan, Life Cycle Cost, Cost / Worth

Bootstrap
alamat : Jln. Letjen T.B. Simatupang No.152 Tanjung Barat Jagakarsa - Jakarta Selatan 12530 telp : (021) 7890 634, 789 0965, 788 31838 fax: (021) 789 0966

© 2024 utama All Rights Reserved
http://167.86.71.230/, http://178.18.249.241/, http://144.91.78.201/, http://144.91.78.54/, http://158.220.111.56/, http://62.171.152.84/, http://144.91.113.160/, http://144.91.120.67/, http://164.68.102.56/, http://164.68.106.236/, http://167.86.81.239/, http://84.247.149.165/, http://38.242.243.12/,