Analisis Penjadwalan Probabilistik Menggunakan Simulasi Monte Carlo (Studi Kasus Pembangunan Gedung Dharmawangsa II, Jakarta)

fakultas :
Teknik
pengarang :
Arco Dwi Erlangga dan Maspul Aini Kambry
tanggal :
Oktober 2020
seri :
Edisi Khusus, No 3, Oktober 2020
issn :
1978-001X

Implementation of probabilistic scheduling with Monte Carlo Simulation on building projects is very rarely used by Project Managers because Monte Carlo Simulation techniques and statistics take a long time. Monte Carlo simulation is a statistical sampling method to assume quantitative problem solving and fix the problem of identification of critical trajectories of a series of activities. Each activity has a distribution curve and its duration chosen randomly to find out the possibility of the total time of the project using the duration of optimistic, most preferred, and pessimistic from the interview results of competent personnel in the Dharmawangsa II Building project, Jakarta, with the help of Oracle Crystal Ball software obtained triangular distribution.

kata kunci :
Monte Carlo, duration, sensitivity level

Bootstrap
alamat : Jln. Letjen T.B. Simatupang No.152 Tanjung Barat Jagakarsa - Jakarta Selatan 12530 telp : (021) 7890 634, 789 0965, 788 31838 fax: (021) 789 0966

© 2024 utama All Rights Reserved
http://167.86.71.230/, http://178.18.249.241/, http://144.91.78.201/, http://144.91.78.54/, http://158.220.111.56/, http://62.171.152.84/, http://144.91.113.160/, http://144.91.120.67/, http://164.68.102.56/, http://164.68.106.236/, http://167.86.81.239/, http://84.247.149.165/, http://38.242.243.12/,