Penggunaan Data Curah Hujan (Trmm) Untuk Perhitungan Bak Tampungan Bangunan Absah Di Terminal Bandara Umbu Mehang Kunda, Waingapu, Pulau Sumba

Publish : 09 September 2020 Fakultas : Teknik Pengarang : Bangun Raharjo, Bambang Soenarto, dan Wulan Seizarwati

abstrak

There are three main components that must be carefully planned in construction work. The three components are good quality, on time work and costs that can be minimized without repeated repair work (rework). Rework is inevitable in the world of construction. Very rarely, if not impossible, not to meet a rework in the implementation of a construction project. ISO 9001 can assist company management in improving the quality of performance and productivity so that it can improve performance and a healthier company culture.

Author: Bangun Raharjo, Bambang Soenarto, dan Wulan Seizarwati
Keywords: TRMM data, ABSAH reservoir design, catchment area, Sumb
Issue Date: Agustus 2020
Publisher: Universitas Tama Jagakarsa
Series / Report no: Edisi Khusus, No 2, Agustus 2020
ISSN: 1978-001X
Appears in Collections: Teknik